Friday, August 19, 2011

pickups, etc.

so yeah, pickups are sunday and monday and tuesday. im staying til wednesday to shoot the boat in front of the greenscreen.

sunday is boat/greenscreen. 10 am
monday is at the beach  10 am
tuesday is johnny and diana/doppleganger. 10 am

also of note:

i have finished importing/organising ALL the footage so far into scenes. pretty cool.
the bunk card yeilded 12 shots of 76. most of which we had re-shot already.
oh well.

i think the movie will be weird , but we will all love it.

2 comments:

  1. well, pickups sure were fun. and i really like all we recorded.
    i wasnt patient enough on wednesday to film the boat/greenscreen in any more than one position. too bad. i think i was a little drained.

    now i am backing up everything and preparing the hard drives to work in a RAID array so everything will always be backed up as soon as i change anything.
    copying all the files through usb 2.0 takes a long time. i have two firewire 800 drives which work much faster, but one that is usb, so i have a bottleneck there. no one is in a hurry though, right? it takes 11 hours for it to copy all the files from one to the other, then i have to copy it back. it might actually be faster to re-import everything. hmmm.

    ReplyDelete